|
|
|
|
NAMING OPPORTUNITIES
There are many ways to give to our renovation project. We are currently featuring the opportunity to name prestigious placements throughout the building.
These Gifts of Distinction encompass each of our three floors, the two theaters, our renovated instructional spaces, the mezzanine, and our new office spaces.
|
The Lower Level
|
Level of Commitment
|
|
The Curved Wall
|
$ 50,000
|
|
Jazz / Steel Pan Studio
|
$ 50,000
|
|
Individual Instructional Rooms (4)
|
$ 25,000 each
|
|
Chamber Music Studio
|
$ 50,000
|
|
Student Study Area
|
$ 50,000
|
| |
|
|
The First Floor
|
|
|
First Floor - Community Landing
|
$ 450,000
|
|
1st Floor Entrance Lobby
|
$ 100,000
|
|
1st Floor Music / Ballet Classroom
|
$ 75,000
|
|
Reception Area / Registration Desk
|
$ 50,000
|
|
Voice Studio
|
$ 25,000
|
|
“Black Box” Community Theater
|
$1,000,000
|
|
Window Seats (5)
|
$ 25,000each
|
|
Community Theater “Tech” Room
|
$ 25,000
|
|
"Artists Entrance"
|
$ 25,000
|
|
Loading Dock
|
$ 50,000
|
|
MacDonald Mural
|
$ 150,000
|
| |
|
|
The Second Floor
|
|
|
Second Floor
|
$ 200,000
|
|
2nd Floor Lobby
|
$ 100,000
|
|
2nd Floor Theatre Loading Dock
|
$ 75,000
|
|
2nd Floor Classroom
|
$ 50,000
|
|
Iron Triangle Proscenium Theatre
|
$2,000,000
|
|
Gallery Seats (120 fixed seats)
|
$ 1,000 each
|
| |
|
|
The Mezzanine
|
|
|
Mezzanine Floor
|
$150,000
|
|
Iron Triangle Theater “Tech” Booth
|
$ 50,000
|
|
Finance Office
|
$ 50,000
|
|
Development Office
|
$ 50,000
|
|
Program Staff Office
|
$100,000
|
| |
|
|
Other Opportunities
|
|
|
Film Projection System
|
$100,000
|
|
Lighting Grid - Community Theatre
|
$100,000
|
|
Lighting Grid- Proscenium Theatre
|
$250,000
|
|
The Elevator
|
$100,000
|
|
North Stairway
|
$ 50,000
|
|
South Stairway
|
$ 50,000
|
|
Specialized Dance Floors (2)
|
$100,000 each
|
| |
|
Contact Charlene Smith, Director of Development for more information.
Charlene E. Smith
charlene.smith@eastbaycenter.org
(510) 323-2489
|
|
|
|